Highway 1a extension project through Quang Nam
Field: | Construction |
Invester: | 545 Construction Joint Stock Company |
Expense: | 1,486 billion dong, of which 228 billion dong is from the state budget |
Status: | complete |
The solution of the construction is to follow the old route (many sections keep the current scale, spread asphalt concrete to enhance the structure of the road surface), supplement the drainage system along urban areas and residential areas.
Scale of the project: The section passing the urban roadbed is 20.5m wide (including four motor lanes and two mixed lanes), the section outside the city is 16.5m wide (including four lanes).